March update

Is it spring yet? All of Indy is buzzing about something, whether it’s the NCAA basketball tournament or the new Indycar design. Our corner of downtown is working hard at assembling Op. 50 in the erecting room. Who would have ever thought we’d be tight for space in that huge room… The Antiphonal divisions are winded and playing and will soon come down to be stained. Meanwhile the main organ is being wired to the switching system in preparation for the open house (the Friday after Easter…is that Great Friday?), Bob, Rob, and Kurt are busy on the main casework, and the rest of us are working on winding, shade frames, and loading unit chests with their pouches and bottom boards.

Stop by and see the progress if you are passing through! Before long it will be at home in Lexington.

Lex on March 18 13